B11 · Rwanda
Assessment of energy efficiency needs in five tea factories
- Period
- Mar 2021 – Jul 2021
- Client
- FONERWA (Rwanda Green Fund)
- AESG's role
- Lead company
- Where
- Rwanda
Reviewing energy use and current wood consumption for heat in Rwandan tea factories; surveying alternative heating energy sources as input substitutes; assessing carbon emissions across five factories; developing guidelines and procedures for new technology and best available practice; preparing energy efficiency guidelines for the tea industry, especially new factories; and mainstreaming energy efficiency through training.
Recovered — in the 2023 profile and the deck, dropped from the 2025 profile. A clean industrial-decarbonisation case study with a named client.