Suez Environment (Safege SAS)
Brussels
Mr Aaron Imperiale
AESG was engaged in working on the preparation of the bid which involved the entire methodology; rationale, strategy, Work scheduling and Logframe. That task also involved a brief visit to Zanzibar to collect the country energy sector background information.